Felicity Solar IVAM10048P1G1 / IVAM12048P1G1
The Felicity IVAM10048P1G1 is a off-grid inverter with specifications as published by the manufacturer. Every figure on this page is taken from the manufacturer
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | IVAM10048P1G1 | IVAM12048P1G1 |
|---|---|---|
| PV String Input Data | ||
| Max PV Input Power | 20000 W | 24000 W |
| Max PV Input Current | 32+32 A | |
| MPP Trackers / Strings per Tracker | 2/2+2 | |
| MPPT Voltage Range | 90 V – 425 V | |
| MPPT Voltage Range at Full Load | 200 V – 425 V | |
| Number of MPP Trackers | 2/2+2 | |
| PV Operating Voltage Range | 90 V – 500 V | |
| Max PV Short-Circuit Current | 48+48 A | |
| MPPT Nominal Voltage | 370 V | |
| Electrical / AC Output Data | ||
| Max AC Output Power | 10000 W | 12000 W |
| Rated AC Power | 10000 W | 12000 W |
| AC Frequency Range | 50Hz/60Hz | |
| Output Frequency | 50Hz/60Hz | |
| Output Waveform | Pure Sine Wave | |
| Max AC Output Current | 43.5 A | 52.2 A |
| Max Grid Input Current | 550 A | 60 A |
| Battery Data | ||
| Battery Voltage Range | 40 V – 60 V | |
| Max Charge Power | 10000 W | 12000 W |
| Max Charge/Discharge Current | 210 A | 250 A |
| Supported Battery Type | Lead-acid or Lithium-ion | |
| Protection Features | ||
| AC Short-Circuit Protection | Yes | |
| AC/DC Surge Protection | TYPE II(DC), TYPE II (AC) | |
| DC Reverse Polarity Protection | Yes | |
| Grid Monitoring | Yes | |
| Insulation Resistance Monitoring | Yes | |
| Over-Current Protection | Yes | |
| Over-Temperature / Thermal Protection | Yes | |
| Over-Voltage Protection | Yes | |
| Overload Protection | Yes | |
| Overvoltage Category | OVC II (DC), OVC III (AC) | |
| Operating Conditions | ||
| Operating Temperature | -40 to +60°C, >45°C Derating | |
| Communication | ||
| Communication Interface | RS485, CAN | |
| Display | LCD+LED | |
| Monitoring Module | WIFI/LAN (Optional) | |
Note: Specifications are based on the official Felicity Solar IVAM10048P1G1 / IVAM12048P1G1 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Syria
| Market | Syria |
| Grid authority / regulator | Ministry of Electricity Syria |
| Quotation currency | SYP |
| Support hours timezone | Asia/Damascus |
| Delivery & installation coverage | Damascus, Aleppo, Homs |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Syria that is Ministry of Electricity Syria. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.