Felicity Solar FLA48460TG2-EU

The Felicity FLA48460TG2-EU is a battery with 23.5kWh of usable storage, a 51.2V nominal bus, > 6000 Cycles (25°C±2°C,0.5C/0.5C,90%DOD,70%EOL) rated. Every figu

Models Covered: FLA48460TG2-EU

Manufacturer: Felicity Solar

Application: The Felicity FLA48460TG2-EU is a battery with 23.5kWh of usable storage, a 51.2V nominal bus, > 6000 Cycles (25°C±2°C,0.5C/0.5C,90%DOD,70%EOL) rated. Every figure on this page is taken from the manufacturer's datasheet for the FLA48460TG2-EU.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter FLA48460TG2-EU
Electrical / AC Output Data
Nominal Voltage 51.2V
Operating Voltage Range 44.8-57.6V
Battery Data
Battery Energy Capacity 23.5kWh
Continuous Charge/Discharge Power 12,500W
Cycle Life > 6000 Cycles (25°C±2°C,0.5C/0.5C,90%DOD,70%EOL)
Depth of Discharge >95%
Max Charge/Discharge Current 250A
Peak Charge/Discharge Current 500A
Scalability / Max Expandable Capacity Max. 15 pcs in Parallel(352.5kWh)
Protection Features
IP Rating IP21
Mechanical Data
Dimensions (W×H×D) 570X250X980MM
Gross Weight 220KG
Weight 186.5KG

Note: Specifications are based on the official Felicity Solar FLA48460TG2-EU datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Qatar

Market Qatar
Grid authority / regulator Kahramaa
Quotation currency QAR
Support hours timezone Asia/Qatar
Delivery & installation coverage Doha, Al Wakrah, Al Khor

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Qatar that is Kahramaa. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.