Felicity Solar FLA48460TG2-EU
The Felicity FLA48460TG2-EU is a battery with 23.5kWh of usable storage, a 51.2V nominal bus, > 6000 Cycles (25°C±2°C,0.5C/0.5C,90%DOD,70%EOL) rated. Every figu
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | FLA48460TG2-EU |
|---|---|
| Electrical / AC Output Data | |
| Nominal Voltage | 51.2V |
| Operating Voltage Range | 44.8-57.6V |
| Battery Data | |
| Battery Energy Capacity | 23.5kWh |
| Continuous Charge/Discharge Power | 12,500W |
| Cycle Life | > 6000 Cycles (25°C±2°C,0.5C/0.5C,90%DOD,70%EOL) |
| Depth of Discharge | >95% |
| Max Charge/Discharge Current | 250A |
| Peak Charge/Discharge Current | 500A |
| Scalability / Max Expandable Capacity | Max. 15 pcs in Parallel(352.5kWh) |
| Protection Features | |
| IP Rating | IP21 |
| Mechanical Data | |
| Dimensions (W×H×D) | 570X250X980MM |
| Gross Weight | 220KG |
| Weight | 186.5KG |
Note: Specifications are based on the official Felicity Solar FLA48460TG2-EU datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Oman
| Market | Oman |
| Grid authority / regulator | Authority for Electricity Regulation Oman |
| Quotation currency | OMR |
| Support hours timezone | Asia/Muscat |
| Delivery & installation coverage | Muscat, Salalah, Sohar |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Oman that is Authority for Electricity Regulation Oman. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.