Felicity Solar IVAM8048P1G1

The Felicity IVAM8048P1G1 is a off-grid inverter with specifications as published by the manufacturer. Every figure on this page is taken from the manufacturer'

Models Covered: IVAM8048P1G1

Manufacturer: Felicity Solar

Application: The Felicity IVAM8048P1G1 is a off-grid inverter with specifications as published by the manufacturer. Every figure on this page is taken from the manufacturer's datasheet for the IVAM8048P1G1.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter IVAM8048P1G1
PV String Input Data
Max PV Input Power 16000 W
Max PV Input / Array Open Circuit Voltage 500 V
Max PV Input Current 27+27 A
MPP Trackers / Strings per Tracker 2/2+2
MPPT Voltage Range 90~425 V
MPPT Voltage Range at Full Load 200~425 V
Number of MPP Trackers 2/2+2
PV Operating Voltage Range 90~500 V
Start-up Voltage 120 V
Max PV Short-Circuit Current 40+40 A
MPPT Nominal Voltage 370 V
Electrical / AC Output Data
Max AC Output Power 8000 W
Peak Power (with duration) 2 times of rated power, 10s
Rated AC Power 8000 W
AC Frequency Range 50Hz/60Hz
AC Input Voltage 230 V
Nominal AC Voltage 230 V
Output Frequency 50Hz/60Hz
Output Waveform Pure Sine Wave
THD / THDi <3%
Max AC Output Current 34.8 A
Max Grid Input Current 50 A
Battery Data
Battery Voltage Range 40~60 V
Max Charge Current 190 A
Max Charge Power 8000 W
Max Discharge Current 190 A
Supported Battery Type Lead-acid or Lithium-ion
Number of Battery Inputs 1

Note: Specifications are based on the official Felicity Solar IVAM8048P1G1 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Lebanon

Market Lebanon
Grid authority / regulator EDL Lebanon
Quotation currency LBP
Support hours timezone Asia/Beirut
Delivery & installation coverage Beirut, Tripoli, Sidon

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Lebanon that is EDL Lebanon. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.