Felicity Solar FLA12300PG2

The Felicity FLA12300PG2 is a battery with a Main Circuit ●●●O ••oo nominal bus, 26,000 Cycles Shown in 3,4 Connection for Parallel Mode User manual User manual

Models Covered: FLA12300PG2

Manufacturer: Felicity Solar

Application: The Felicity FLA12300PG2 is a battery with a Main Circuit ●●●O ••oo nominal bus, 26,000 Cycles Shown in 3,4 Connection for Parallel Mode User manual User manual rated. Every figure on this page is taken from the manufacturer's datasheet for the FLA12300PG2.

Download PDF Datasheet WhatsApp Us

Technical Specifications

Technical Specifications
Parameter FLA12300PG2
Electrical / AC Output Data
Operating Voltage Range 11.2-14,4V Series Mode Warnings
Cut-off Voltage 12V
Max Charging Voltage 14.4V Trigger-GND C02
Battery Data
Battery Energy Capacity 3.75kWh RUN LED: Indicates normal battery operating status(remains on during Dallery
Continuous Charge/Discharge Power 1875W
Cycle Life 26,000 Cycles Shown in 3,4 Connection for Parallel Mode User manual User manual
Max Charge Current 150A'N C03 Cell overvoltage 2. INTRODUCTION Household
Peak Charge/Discharge Current 50% BTCB0606/BTCB0303 •ooo A
Floating / Constant Charge Voltage 14,4V Battery undervoltage 1. Assemble battery ring
Protection Features
IP Rating IP21 Paralel Warnings Mode Diagram
Protection Features 4. OPERATION Main Circuit
Mechanical Data
Dimensions (W×H×D) 379x241x286mm C07 OFF ON
Gross Weight C05 kg
Package Dimensions 438x300x344mm ⑥ Battery
Cable Length Battery m
Communication
Communication Interface Used for
Display LED

Note: Specifications are based on the official Felicity Solar FLA12300PG2 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.

Availability & grid compliance in UAE

Market UAE
Grid authority / regulator DEWA, ADDC, SEWA
Quotation currency AED
Support hours timezone Asia/Dubai
Delivery & installation coverage Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.

Availability & grid compliance in Lebanon

Market Lebanon
Grid authority / regulator EDL Lebanon
Quotation currency LBP
Support hours timezone Asia/Beirut
Delivery & installation coverage Beirut, Tripoli, Sidon

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Lebanon that is EDL Lebanon. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.