Felicity Solar FLA48400TG1
The Felicity FLA48400TG1 is a battery with 20.48kWh of usable storage, a 51.2V nominal bus, ≥6000@ 25°C rated. Every figure on this page is taken from the manuf
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | FLA48400TG1 |
|---|---|
| Electrical / AC Output Data | |
| Nominal Voltage | 51.2V |
| Operating Voltage Range | 44.8-57.6V |
| Battery Data | |
| Battery Energy Capacity | 20.48kWh |
| Battery Type / Chemistry | LiFePO4 |
| Continuous Charge/Discharge Power | Charge 10.2kW Discharge 13kW |
| Depth of Discharge | 95% |
| Max Continuous Charge/Discharge Current | Charge 200A Discharge 250A |
| Peak Charge/Discharge Current | 300A @ 15s |
| Scalability / Max Expandable Capacity | Up to 15 units in parallel kWh |
| Protection Features | |
| Protection Features | BMS, Fuse, Breaker, MX+OF |
| Mechanical Data | |
| Dimensions (W×H×D) | 960×450×265mm |
| Gross Weight | 179kg±3% |
| Installation / Mounting | Floor-Mounted |
| Net Weight | 150.5kg±3% |
| Package Dimensions | 1040×570×481mm |
| Operating Conditions | |
| Operating Temperature | Charge 0~55°C Discharge -20~55 °C |
| Communication | |
| Communication Interface | CAN2.0, RS485,WIFI, Bluetooth |
| Display | LCD+LED |
Note: Specifications are based on the official Felicity Solar FLA48400TG1 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Italy
| Market | Italy |
| Grid authority / regulator | ARERA Italy |
| Quotation currency | EUR |
| Support hours timezone | Europe/Rome |
| Delivery & installation coverage | Rome, Milan, Naples, Turin |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Italy that is ARERA Italy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.