Felicity Solar FLA48460-EU
The Felicity FLA48460-EU is a lifepo4 battery pack with 23.5kWh of usable storage, a 51.2V nominal bus, >6,000 Cycles rated. Every figure on this page is taken
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | FLA48460-EU |
|---|---|
| Electrical / AC Output Data | |
| Peak / Surge Power (W) | 10,000W |
| Nominal Voltage | 51.2V |
| Operating Voltage Range | 44.8-57.6V |
| Battery Data | |
| Battery Energy Capacity | 23.5kWh |
| Cycle Life | >6,000 Cycles |
| Depth of Discharge | ≥95% |
| Max Charge/Discharge Current | 200A |
| Peak Charge/Discharge Current | 300A |
| Scalability / Max Expandable Capacity | Max.15 pcs in Parallel(354kWh) |
| Protection Features | |
| IP Rating | IP21 |
| Mechanical Data | |
| Dimensions (W×H×D) | 718X380X990MM |
| Gross Weight | 256KG |
| Weight | 226KG |
Note: Specifications are based on the official Felicity Solar FLA48460-EU datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Spain
| Market | Spain |
| Grid authority / regulator | CNMC Spain |
| Quotation currency | EUR |
| Support hours timezone | Europe/Madrid |
| Delivery & installation coverage | Madrid, Barcelona, Valencia, Seville |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Spain that is CNMC Spain. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.