Felicity Solar FLA24100PG2
The Felicity FLA24100PG2 is a lifepo4 battery pack with 2.56kWh of usable storage, a 25.6V nominal bus, >6,000 Cycles rated. Every figure on this page is taken
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | FLA24100PG2 |
|---|---|
| Electrical / AC Output Data | |
| Nominal Voltage | 25.6V |
| Operating Voltage Range | 22.4-28.8V |
| Battery Data | |
| Battery Energy Capacity | 2.56kWh |
| Continuous Charge/Discharge Power | 3750W |
| Cycle Life | >6,000 Cycles |
| Depth of Discharge | >95% |
| Peak Charge/Discharge Current | 150A |
| Scalability / Max Expandable Capacity | Max. 16 pcs in Parallel(40.96kWh) |
| Protection Features | |
| IP Rating | IP21 |
| Mechanical Data | |
| Dimensions (W×H×D) | 350X306X185MM |
| Gross Weight | 22KG |
| Weight | 19.5KG |
Note: Specifications are based on the official Felicity Solar FLA24100PG2 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Bahrain
| Market | Bahrain |
| Grid authority / regulator | EWA Bahrain |
| Quotation currency | BHD |
| Support hours timezone | Asia/Bahrain |
| Delivery & installation coverage | Manama, Riffa, Muharraq |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Bahrain that is EWA Bahrain. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.