The Felicity FLM500-125/261 is an energy storage system with a 400V nominal bus, ≥8000 rated, 2670KG IP55 shipped.
Technical Specifications
| Parameter | FLM500-125/261 |
|---|---|
| PV String Input Data | |
| Cell Technology | LFP 3.2V/314 Ah |
| Battery Data | |
| System Battery Configuration | 260S1P |
| Nominal Capacity | 261.2kWh |
| Max Charge/Discharge Rate | 0.5P |
| Depth of Discharge | 95% |
| Cycle Life | ≥8000 |
| Electrical / AC Output Data | |
| Nominal Voltage | 400V |
| Input Voltage Range | 360-440V |
| Rated AC Power | 125kW |
| Grid / AC Frequency | 50Hz/60Hz THD <3% |
| Adjustable Power Factor Range | -1~1 |
| Unbalanced Output | 100% |
| Maximum System Efficiency | ≥90% |
| Max. Parallel Units | "On grid:20 pcs; Off grid: 6 pcs" |
| Additional Specifications | |
| Access way | 3P4L |
| Anti-corrosion Degree | C4 |
| Protection Features | |
| DC Component Detection | <0.5% |
| Aerosol / Fire Suppression | Aerosol fire extinguishing equipment, Smoke detector, Heat detector, Water fire |
| Communication | |
| Communication Interface | Ethernet/RS485 |
| Mechanical Data | |
| Dimensions (W×H×D) | 1050*2400*1350(mm) |
| Weight | 2670KG IP55 |
| Cooling Method | Liquid cooling |
| Operating Conditions | |
| Noise Level | <75db |
| Relative Humidity | 0-95% |
| Operating Temperature | -25~55°C(Derating from 45°C) |
| Operating Altitude | 2000m (Derating from 2000m) |
Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.
Availability & grid compliance in Yemen
| Market | Yemen |
| Grid authority / regulator | Public Electricity Corporation (PEC), Ministry of Electricity and Energy |
| Quotation currency | YER |
| Support hours timezone | Asia/Aden |
| Delivery & installation coverage | Sana'a, Aden, Taiz, Al Hudaydah, Mukalla |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.