Felicity Solar LPBF24200-A
The Felicity LPBF24200-A is a lifepo4 battery pack with 5kWh of usable storage, a 25.6V nominal bus, >6,000 Cycles rated. Every figure on this page is taken fro
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | LPBF24200-A |
|---|---|
| Electrical / AC Output Data | |
| Peak / Surge Power (W) | 3,750W |
| Nominal Voltage | 25.6V |
| Operating Voltage Range | 24-28.8V |
| Battery Data | |
| Battery Energy Capacity | 5kWh |
| Continuous Charge/Discharge Power | <2,500W |
| Cycle Life | >6,000 Cycles |
| Depth of Discharge | ≥95% |
| Peak Charge/Discharge Current | 150A |
| Scalability / Max Expandable Capacity | Max. 6 pcs in Parallel(30kWh) |
| Protection Features | |
| IP Rating | IP21 |
| Mechanical Data | |
| Dimensions (W×H×D) | 415x390x162MM |
| Gross Weight | 37KG |
| Installation / Mounting | Wall-Mounted / Floor-Mounted |
| Weight | 33KG |
Note: Specifications are based on the official Felicity Solar LPBF24200-A datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Syria
| Market | Syria |
| Grid authority / regulator | Ministry of Electricity Syria |
| Quotation currency | SYP |
| Support hours timezone | Asia/Damascus |
| Delivery & installation coverage | Damascus, Aleppo, Homs |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Syria that is Ministry of Electricity Syria. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.