Felicity Solar IVEM3024
The Felicity IVEM3024 is a off-grid inverter with 3000VA rated output. Every figure on this page is taken from the manufacturer's datasheet for the IVEM3024.
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | IVEM3024 |
|---|---|
| PV String Input Data | |
| Max PV Input Power | 4000W |
| Start-up Voltage | 125V Inverter Mode Specifications |
| Max PV Open-Circuit Voltage | 500V |
| Nominal DC Voltage | 24V |
| Electrical / AC Output Data | |
| Max Efficiency | 93% |
| Rated AC Power | 3000W |
| Rated Apparent Power | 3000VA |
| Surge / Peak Power | 2* VA |
| AC Input Voltage | 230Vac |
| AC Output Voltage | 230Vac+5% |
| Grid / AC Frequency | 50Hz/60Hz (Auto Detection) |
| Input Voltage Range | 90-280Vac |
| Output Frequency | 50±0.3Hz/60Hz±0.3Hz(Adjustable) |
| Output Waveform | Pure Sine Wave |
| Parallel Capability | No |
| Capable of Starting Electric Motor | Yes |
| Max AC Input Current | 15A |
| Max AC Input Voltage | 280Vac |
| Battery Data | |
| Max Charge Current | 100A |
| Max Solar / PV Charge Current | 100A |
| Protection Features | |
| Output Short-Circuit Protection | Yes General Specifications |
| Overcharge Protection | Yes Solar Charging & Grid Charging |
| Mechanical Data | |
| Dimensions (W×H×D) | 395*295*129MM |
| Net Weight | 10.8KG |
| Package Dimensions | 472*372*202MM |
| Operating Conditions | |
| Operating Temperature | 0°C~55°C |
Note: Specifications are based on the official Felicity Solar IVEM3024 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Morocco
| Market | Morocco |
| Grid authority / regulator | ONEE Morocco |
| Quotation currency | MAD |
| Support hours timezone | Africa/Casablanca |
| Delivery & installation coverage | Casablanca, Rabat, Marrakech, Tangier |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Morocco that is ONEE Morocco. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.