Felicity Solar SCCM3024-III
The Felicity SCCM3024-III is a solar charge controller with specifications as published by the manufacturer. Every figure on this page is taken from the manufac
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | SCCM3024-III |
|---|---|
| PV String Input Data | |
| PV Start-up Voltage | 20V |
| Electrical / AC Output Data | |
| Nominal System Voltage | 12V, 24V, 48V (Auto Detection) |
| Battery Data | |
| Temperature Compensation Coefficient | -5 mV/°C/cell (25°Cref.) |
| Operating Conditions | |
| Operating Temperature | 0°C to +55 °C |
| Relative Humidity | 0%-90%RH (No Condensing) |
| Storage Temperature Range | -25 °C to +75 °C |
Note: Specifications are based on the official Felicity Solar SCCM3024-III datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Germany
| Market | Germany |
| Grid authority / regulator | Bundesnetzagentur |
| Quotation currency | EUR |
| Support hours timezone | Europe/Berlin |
| Delivery & installation coverage | Berlin, Munich, Hamburg, Frankfurt |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Germany that is Bundesnetzagentur. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.