Felicity Solar IVPS0712 / IVPS1512
The Felicity IVPS0712 is a off-grid inverter with specifications as published by the manufacturer. Every figure on this page is taken from the manufacturer's da
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | IVPS0712 | IVPS1512 |
|---|---|---|
| Electrical / AC Output Data | ||
| Max Efficiency | 90% | |
| AC Input Voltage | 220Vac | |
| AC Output Voltage | 220Vac±5% | |
| Grid / AC Frequency | 50Hz/60Hz | |
| Output Waveform | Pure Sine Wave | |
| AC Voltage Regulation (Battery Mode) | +5%rms | |
| Capable of Starting Electric Motor | Yes | |
| Max AC Input Voltage | 280Vrms | |
| Protection Features | ||
| Output Short-Circuit Protection | Yes | |
| Overcharge Protection | Yes | |
| Mechanical Data | ||
| Dimensions (W×H×D) | 312 x 246 x 440 mm | |
| Operating Conditions | ||
| Operating Temperature | 0°C~40°C | |
Note: Specifications are based on the official Felicity Solar IVPS0712 / IVPS1512 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Germany
| Market | Germany |
| Grid authority / regulator | Bundesnetzagentur |
| Quotation currency | EUR |
| Support hours timezone | Europe/Berlin |
| Delivery & installation coverage | Berlin, Munich, Hamburg, Frankfurt |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Germany that is Bundesnetzagentur. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.