Felicity MJS Solar Solutions

Felicity FLB48279TG1-AU

The Felicity FLB48279TG1-AU is a battery with 13.98kWh of usable storage, a 51.2V nominal bus, ≥6000@ 25°C rated.

Models Covered: FLB48279TG1-AU

Manufacturer: Felicity Solar

Application: The Felicity FLB48279TG1-AU is a battery with 13.98kWh of usable storage, a 51.2V nominal bus, ≥6000@ 25°C rated. Every figure on this page is taken from the manufacturer's datasheet for the FLB48279TG1-AU.

Technical Specifications

Technical Specifications
Parameter FLB48279TG1-AU
Battery Data
Battery Energy Capacity 13.98kWh
Battery Type / Chemistry LiFePO4
Max Continuous Charge/Discharge Current Charge 150A Discharge 150A
Continuous Charge/Discharge Power Charge 7680W Discharge 7680W
Depth of Discharge 95%
Scalability / Max Expandable Capacity Up to 32 units in parallel
Peak Charge/Discharge Current 300A @ 15s
Electrical / AC Output Data
Nominal Voltage 51.2V
Operating Voltage Range 44.8-57.6V
Communication
Communication Interface CAN2.0, RS485,WIFI, Bluetooth
Display LED
Protection Features
Protection Features BMS, Fuse, Breaker, MX+OF
Mechanical Data
Installation / Mounting Floor-Mounted
Net Weight 115Kg
Gross Weight 124.5Kg
Dimensions (W×H×D) 895×450x235mm
Package Dimensions 1013×588×342mm
Operating Conditions
Operating Temperature Charge 0~55°C Discharge -20~55 °C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Yemen

Market Yemen
Grid authority / regulator Public Electricity Corporation (PEC), Ministry of Electricity and Energy
Quotation currency YER
Support hours timezone Asia/Aden
Delivery & installation coverage Sana'a, Aden, Taiz, Al Hudaydah, Mukalla

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.